About us

TOV "PIKA"

In our work, we use a variety of software complexes that help solve engineering problems in a shorter time and provide cost savings to the customer both during the construction phase of the facility and at the stage of its further exploitation. The company plans to completely switch to BIM design by the end of 2020.

Main activity

1. Architectural-construction design - a complex of crafts, which includes the creation of the concept of the future object and its further detail and refinement in accordance with the requirements of existing regulatory documents and wishes of the customer.
2. Designing of external networks - a complex of works on the calculation and development of a complete scheme of connection of engineering networks (water supply and sewerage, heat supply, electricity supply and low-voltage networks, etc.), which ensure the full functioning of the facility for the entire period of its operation.
3. Designing and developing special sections is a set of works that involves the development of highly specialized sections. The need to develop such sections depends on the complexity of the object or the engineering conditions of the construction site.
4. Audit and verification of the developed design documentation for compliance with applicable building codes. Analysis of engineering solutions for engineering literacy and energy efficiency.